| Score | Incumbent | Agency | Industry | State | Total obligated | Ends |
|---|
| 93 | CARIBE TECNO CRL PROJECT PR ERFO FS 2017 - 1(3) THE PROJECT CONSISTS OF REPAIRING MULTIPLE STORM DAMAGED… Why 93? ends in 6 mo · no option years left · $14M · 3 offers last time · standalone contract- Ends in about 6 months (May 1, 2027). +30/30
- No unexercised option years on record, so new work likely has to be awarded when it ends. +20/20
- $14M obligated so far. +16/20
- Last time it was competed among eligible firms (set-aside competition) with 3 offers. +17/20
- Standalone contract, so the follow-on is not tied to an existing vehicle. +10/10
- The incumbent has held it since 2021 (about 5 years).
| Department of Transportation Federal Highway Administration | Highway, Street, and Bridge… | PR | $13,974,869 | May 1, 2027 |
| 92 | JPI CONSTRUCTION LLC LA MINA TRAIL RECONSTRUCTION DB PROJECT Why 92? ends in 6 mo · no option years left · $12M · 2 offers last time · standalone contract- Ends in about 6 months (Apr 30, 2027). +30/30
- No unexercised option years on record, so new work likely has to be awarded when it ends. +20/20
- $12M obligated so far. +15/20
- Last time it was competed among eligible firms (set-aside competition) with 2 offers. +17/20
- Standalone contract, so the follow-on is not tied to an existing vehicle. +10/10
- The incumbent has held it since 2025 (about 1 year).
| Department of Agriculture Forest Service | Highway, Street, and Bridge… | PR | $11,931,160 | Apr 30, 2027 |
| 92 | MFS CONSTRUCTION LLC GATE 213019 JACOB RIIS PARKING LOT Why 92? ends in 6 mo · no option years left · $10.0M · 3 offers last time · standalone contract- Ends in about 6 months (Apr 19, 2027). +30/30
- No unexercised option years on record, so new work likely has to be awarded when it ends. +20/20
- $10.0M obligated so far. +15/20
- Last time it was competed under simplified acquisition procedures with 3 offers. +17/20
- Standalone contract, so the follow-on is not tied to an existing vehicle. +10/10
| Department of the Interior National Park Service | Highway, Street, and Bridge… | NJ | $9,973,430 | Apr 19, 2027 |
| 88 | MISSOURI RIVER CONTRACTORS, LLC YELL 338221 - BRIDGE PRESERVATION - 5 BRIDGES Why 88? ends in 7 mo · no option years left · $7.7M · 4 offers last time · standalone contract- Ends in about 7 months (May 24, 2027). +30/30
- No unexercised option years on record, so new work likely has to be awarded when it ends. +20/20
- $7.7M obligated so far. +14/20
- Last time it was competed among eligible firms (set-aside competition) with 4 offers. +14/20
- Standalone contract, so the follow-on is not tied to an existing vehicle. +10/10
| Department of the Interior National Park Service | Highway, Street, and Bridge… | WY | $7,666,614 | May 24, 2027 |
| 87 | AOC CALTON LTD CONSTRUCTION CONTRACT FOR THE COLOMBIA LAND PORT OF ENTRY, BORDER ROADWAY IMPROVEMENT &… Why 87? ends in 10 mo · no option years left · $18M · 3 offers last time · standalone contract- Ends in about 10 months (Aug 20, 2027). +23/30
- No unexercised option years on record, so new work likely has to be awarded when it ends. +20/20
- $18M obligated so far. +17/20
- Last time it was competed among eligible firms (set-aside competition) with 3 offers. +17/20
- Standalone contract, so the follow-on is not tied to an existing vehicle. +10/10
| General Services Administration Public Buildings Service | Highway, Street, and Bridge… | TX | $18,417,474 | Aug 20, 2027 |
| 86 | DDD-DVG JOINT VENTURE LLC PROJECT PR ER DOT PRMNT RPR(13): THE PROJECT CONSISTS OF REPAIRING DAMAGE CAUSED BY… Why 86? ends in 7 mo · no option years left · $13M · 6 offers last time · standalone contract- Ends in about 7 months (May 31, 2027). +29/30
- No unexercised option years on record, so new work likely has to be awarded when it ends. +20/20
- $13M obligated so far. +15/20
- Last time it was competed among eligible firms (set-aside competition) with 6 offers (crowded field). +12/20
- Standalone contract, so the follow-on is not tied to an existing vehicle. +10/10
- The incumbent has held it since 2022 (about 4 years).
| Department of Transportation Federal Highway Administration | Highway, Street, and Bridge… | PR | $12,983,225 | May 31, 2027 |
| 86 | NIEVES & NIEVES ENGINEERS & CONTRACTORS INC PROJECT PR ER PRMNT RPR(9) THE PROJECT CONSISTS OF REPAIRING LANDSLIDE AND WASHOUT… Why 86? ends in 7 mo · no option years left · $7.0M · 4 offers last time · standalone contract- Ends in about 7 months (May 31, 2027). +29/30
- No unexercised option years on record, so new work likely has to be awarded when it ends. +20/20
- $7.0M obligated so far. +13/20
- Last time it was competed among eligible firms (set-aside competition) with 4 offers. +14/20
- Standalone contract, so the follow-on is not tied to an existing vehicle. +10/10
- The incumbent has held it since 2022 (about 5 years).
| Department of Transportation Federal Highway Administration | Highway, Street, and Bridge… | PR | $7,005,308 | May 31, 2027 |
| 85 | NH1 JV DESIGN BUILD CONSTRUCTION CONTRACT TO PROVIDE 388TH EAST APRON REPAIRS LOCATED AT HILL… Why 85? ends in 12 mo · no option years left · $49M · 3 offers last time · standalone contract- Ends in about 12 months (Nov 1, 2027). +18/30
- No unexercised option years on record, so new work likely has to be awarded when it ends. +20/20
- $49M obligated so far. +20/20
- Last time it was competed among eligible firms (set-aside competition) with 3 offers. +17/20
- Standalone contract, so the follow-on is not tied to an existing vehicle. +10/10
- The incumbent has held it since 2023 (about 3 years).
| Department of Defense Department of the Army | Highway, Street, and Bridge… | UT | $48,762,674 | Nov 1, 2027 |
| 84 | IAN CORPORATION SAKW 23-5001 REPAIR THUNDER LANDING ZONE (LZ) Why 84? ends in 11 mo · no option years left · $36M · 4 offers last time · standalone contract- Ends in about 11 months (Sep 23, 2027). +21/30
- No unexercised option years on record, so new work likely has to be awarded when it ends. +20/20
- $36M obligated so far. +19/20
- Last time it was competed among eligible firms (set-aside competition) with 4 offers. +14/20
- Standalone contract, so the follow-on is not tied to an existing vehicle. +10/10
- The incumbent has held it since 2024 (about 2 years).
| Department of Defense Department of the Air Force | Highway, Street, and Bridge… | GU | $35,836,338 | Sep 23, 2027 |
| 84 | SURFACE CONTRACTING, INC THE GILA NATIONAL FOREST HAS A REQUIREMENT FOR THE REHABILITATION AND MAINTENANCE OF… Why 84? ends in 9 mo · no option years left · $13M · 4 offers last time · standalone contract- Ends in about 9 months (Jul 21, 2027). +25/30
- No unexercised option years on record, so new work likely has to be awarded when it ends. +20/20
- $13M obligated so far. +15/20
- Last time it was competed among eligible firms (set-aside competition) with 4 offers. +14/20
- Standalone contract, so the follow-on is not tied to an existing vehicle. +10/10
| Department of Agriculture Forest Service | Highway, Street, and Bridge… | NM | $13,260,168 | Jul 21, 2027 |
| 80 | KOVILIC CONSTRUCTION CO INC WV NP NERI 107(2) THE PROJECT CONSISTS OF GRANULAR BACKFILL, MSE WALL CONSTRUCTION, DEEP… Why 80? ends in 12 mo · no option years left · $10M · 3 offers last time · standalone contract- Ends in about 12 months (Oct 31, 2027). +18/30
- No unexercised option years on record, so new work likely has to be awarded when it ends. +20/20
- $10M obligated so far. +15/20
- Last time it was competed among eligible firms (set-aside competition) with 3 offers. +17/20
- Standalone contract, so the follow-on is not tied to an existing vehicle. +10/10
- The incumbent has held it since 2024 (about 2 years).
| Department of Transportation Federal Highway Administration | Highway, Street, and Bridge… | WV | $10,220,645 | Oct 31, 2027 |
| 79 | BILLY W. JARRETT CONSTRUCTION COMPANY, INC. EO 14398- IMPROVE ROADS AND ENTRANCES, CENTRAL TX HCS. PROJECT #674-20-109 Why 79? ends in 13 mo · no option years left · $18M · 3 offers last time · standalone contract- Ends in about 13 months (Nov 29, 2027). +16/30
- No unexercised option years on record, so new work likely has to be awarded when it ends. +20/20
- $18M obligated so far. +16/20
- Last time it was competed among eligible firms (set-aside competition) with 3 offers. +17/20
- Standalone contract, so the follow-on is not tied to an existing vehicle. +10/10
| Department of Veterans Affairs Department of Veterans Affairs | Highway, Street, and Bridge… | TX | $17,740,000 | Nov 29, 2027 |
| 78 | CLASSIC SITE SOLUTIONS INC DEWA 310424 325752 324741 - SAFETY AND PAVEMENT IMPROVEMENTS TO ROUTE 209 & MCDADE TRAIL… Why 78? ends in 14 mo · no option years left · $24M · 3 offers last time · standalone contract- Ends in about 14 months (Dec 31, 2027). +14/30
- No unexercised option years on record, so new work likely has to be awarded when it ends. +20/20
- $24M obligated so far. +17/20
- Last time it was competed among eligible firms (set-aside competition) with 3 offers. +17/20
- Standalone contract, so the follow-on is not tied to an existing vehicle. +10/10
| Department of the Interior National Park Service | Highway, Street, and Bridge… | PA | $23,914,419 | Dec 31, 2027 |
| 78 | E CORP GRAND TETON NATIONAL PARK (GRTE), TAGGART LAKE AREA RENEWAL - PMIS 314711 Why 78? ends in 13 mo · no option years left · $8.3M · 3 offers last time · standalone contract- Ends in about 13 months (Nov 15, 2027). +17/30
- No unexercised option years on record, so new work likely has to be awarded when it ends. +20/20
- $8.3M obligated so far. +14/20
- Last time it was competed among eligible firms (set-aside competition) with 3 offers. +17/20
- Standalone contract, so the follow-on is not tied to an existing vehicle. +10/10
| Department of the Interior National Park Service | Highway, Street, and Bridge… | WY | $8,298,013 | Nov 15, 2027 |
| 77 | KOVILIC CONSTRUCTION CO INC PROJECT NC NP BLRI 2A16 THE PROJECT CONSISTS OF THE REHABILITATION OF BIG PINE CREEK… Why 77? ends in 14 mo · no option years left · $14M · 3 offers last time · standalone contract- Ends in about 14 months (Dec 31, 2027). +14/30
- No unexercised option years on record, so new work likely has to be awarded when it ends. +20/20
- $14M obligated so far. +16/20
- Last time it was competed among eligible firms (set-aside competition) with 3 offers. +17/20
- Standalone contract, so the follow-on is not tied to an existing vehicle. +10/10
- The incumbent has held it since 2023 (about 3 years).
| Department of Transportation Federal Highway Administration | Highway, Street, and Bridge… | NC | $13,648,375 | Dec 31, 2027 |
| 75 | METRO PAVING CORP PROJECT NP JFK1(2) NAMA16(2) TRL(1): THE PROJECT CONSISTS OF KENNEDY CENTER… Why 75? ends in 14 mo · no option years left · $21M · 4 offers last time · standalone contract- Ends in about 14 months (Dec 31, 2027). +14/30
- No unexercised option years on record, so new work likely has to be awarded when it ends. +20/20
- $21M obligated so far. +17/20
- Last time it was competed among eligible firms (set-aside competition) with 4 offers. +14/20
- Standalone contract, so the follow-on is not tied to an existing vehicle. +10/10
- The incumbent has held it since 2021 (about 6 years).
| Department of Transportation Federal Highway Administration | Highway, Street, and Bridge… | DC | $20,672,183 | Dec 31, 2027 |
| 74 | YORKSHIRE INDUSTRIES LLC N191 VOYA 335009 REHAB RAINY AND ASH PAVEMENT PRESERVATION PROJECT AT VOYAGEURS NATIONAL… Why 74? ends in 14 mo · no option years left · $7.3M · 2 offers last time · standalone contract- Ends in about 14 months (Dec 31, 2027). +14/30
- No unexercised option years on record, so new work likely has to be awarded when it ends. +20/20
- $7.3M obligated so far. +13/20
- Last time it was competed under simplified acquisition procedures with 2 offers. +17/20
- Standalone contract, so the follow-on is not tied to an existing vehicle. +10/10
| Department of the Interior National Park Service | Highway, Street, and Bridge… | NY | $7,294,212 | Dec 31, 2027 |
| 73 | J.M. CARIBBEAN BUILDERS CORP PROJECT PR ER PRMNT RPR(7): THE PROJECT CONSISTS OF REPAIRING SIGNS AND GUARDRAILS… Why 73? ends in 14 mo · no option years left · $23M · 6 offers last time · standalone contract- Ends in about 14 months (Dec 31, 2027). +14/30
- No unexercised option years on record, so new work likely has to be awarded when it ends. +20/20
- $23M obligated so far. +17/20
- Last time it was competed among eligible firms (set-aside competition) with 6 offers (crowded field). +12/20
- Standalone contract, so the follow-on is not tied to an existing vehicle. +10/10
- The incumbent has held it since 2022 (about 4 years).
| Department of Transportation Federal Highway Administration | Highway, Street, and Bridge… | PR | $22,614,111 | Dec 31, 2027 |
| 73 | BERING STRAITS GLOBAL INNOVATIONS, LLC THE PROJECT IS TO WIDEN VENONA RD, FROM A TWO-LANE UNDIVIDED ROAD TO A FOUR-LANE DIVIDED… Why 73? ends in 15 mo · no option years left · $21M · 4 offers last time · standalone contract- Ends in about 15 months (Jan 22, 2028). +12/30
- No unexercised option years on record, so new work likely has to be awarded when it ends. +20/20
- $21M obligated so far. +17/20
- Last time it was competed among eligible firms (set-aside competition) with 4 offers. +14/20
- Standalone contract, so the follow-on is not tied to an existing vehicle. +10/10
| Department of Defense Department of the Army | Highway, Street, and Bridge… | MD | $20,889,408 | Jan 22, 2028 |
| 73 | HOWARD W. PENCE, INC. TN ERFO FS CHRKE804 2020-2(5): THE PROJECT CONSISTS OF REPAIRING VARIOUS DAMAGED SITES… Why 73? ends in 13 mo · no option years left · $6.1M · 6 offers last time · standalone contract- Ends in about 13 months (Nov 3, 2027). +18/30
- No unexercised option years on record, so new work likely has to be awarded when it ends. +20/20
- $6.1M obligated so far. +13/20
- Last time it was competed among eligible firms (set-aside competition) with 6 offers (crowded field). +12/20
- Standalone contract, so the follow-on is not tied to an existing vehicle. +10/10
| Department of Transportation Federal Highway Administration | Highway, Street, and Bridge… | TN | $6,132,853 | Nov 3, 2027 |
| 72 | NOVEL CONSTRUCTION LLC THE PROJECT CONSISTS OF REPAIRING DAMAGE CAUSED BY HURRICANES IRMA AND MARIA ON PR-5568,… Why 72? ends in 14 mo · no option years left · $16M · 6 offers last time · standalone contract- Ends in about 14 months (Dec 31, 2027). +14/30
- No unexercised option years on record, so new work likely has to be awarded when it ends. +20/20
- $16M obligated so far. +16/20
- Last time it was competed among eligible firms (set-aside competition) with 6 offers (crowded field). +12/20
- Standalone contract, so the follow-on is not tied to an existing vehicle. +10/10
- The incumbent has held it since 2023 (about 3 years).
| Department of Transportation Federal Highway Administration | Highway, Street, and Bridge… | PR | $15,510,661 | Dec 31, 2027 |
| 72 | ROAD WORX, INC. PROJECT TN ERFO FS CHRKE804 2020-2(1): THIS PROJECT CONSISTS OF REPAIRING VARIOUS… Why 72? ends in 12 mo · no option years left · $3.6M · 11 offers last time · standalone contract- Ends in about 12 months (Oct 25, 2027). +19/30
- No unexercised option years on record, so new work likely has to be awarded when it ends. +20/20
- $3.6M obligated so far. +11/20
- Last time it was competed among eligible firms (set-aside competition) with 11 offers (crowded field). +12/20
- Standalone contract, so the follow-on is not tied to an existing vehicle. +10/10
| Department of Transportation Federal Highway Administration | Highway, Street, and Bridge… | TN | $3,565,572 | Oct 25, 2027 |
| 69 | CENTRAL SOUTHERN CONSTRUCTION CORP. MS NP GUIS 15(4) THIS PROJECT CONSISTS OF THE CONSTRUCTION OF PAVED SHOULDERS,… Why 69? ends in 15 mo · no option years left · $9.3M · 6 offers last time · standalone contract- Ends in about 15 months (Jan 14, 2028). +13/30
- No unexercised option years on record, so new work likely has to be awarded when it ends. +20/20
- $9.3M obligated so far. +14/20
- Last time it was competed among eligible firms (set-aside competition) with 6 offers (crowded field). +12/20
- Standalone contract, so the follow-on is not tied to an existing vehicle. +10/10
- The incumbent has held it since 2025 (about 1 year).
| Department of Transportation Federal Highway Administration | Highway, Street, and Bridge… | MS | $9,271,935 | Jan 14, 2028 |
| 67 | APEX CONSTRUCTION GROUP, LLC PROJECT TN ERFO FS CHRKE804 2020-2(3): THIS PROJECT CONSISTS OF REPAIRING STORM AND… Why 67? ends in 15 mo · no option years left · $7.3M · 8 offers last time · standalone contract- Ends in about 15 months (Jan 29, 2028). +12/30
- No unexercised option years on record, so new work likely has to be awarded when it ends. +20/20
- $7.3M obligated so far. +13/20
- Last time it was competed among eligible firms (set-aside competition) with 8 offers (crowded field). +12/20
- Standalone contract, so the follow-on is not tied to an existing vehicle. +10/10
| Department of Transportation Federal Highway Administration | Highway, Street, and Bridge… | TN | $7,278,652 | Jan 29, 2028 |
| 64 | RED EAGLE 3 JV DESIGN BUILD CONTRACT FOR SANTA TERESA LAND PORT OF ENTRY BORDER ROADWAY IMPROVEMENT AND… Why 64? ends in 8 mo · options could run to Aug 2027 · $8.3M · 6 offers last time · standalone contract- Ends in about 8 months (Jun 21, 2027). +28/30
- Unexercised options on record could extend it to Aug 20, 2027, so the agency may extend instead of recompeting. +0/20
- $8.3M obligated so far. +14/20
- Last time it was competed among eligible firms (set-aside competition) with 6 offers (crowded field). +12/20
- Standalone contract, so the follow-on is not tied to an existing vehicle. +10/10
| General Services Administration Public Buildings Service | Highway, Street, and Bridge… | NM | $8,281,140 | Jun 21, 2027 |
| 62 | LPC CONTRACTORS INC PROJECT PR ER DOT PRMNT RPR(18) THE PROJECT CONSISTS OF REPAIRING LANDSLIDES CAUSED BY… Why 62? ends in 17 mo · no option years left · $7.2M · 6 offers last time · standalone contract- Ends in about 17 months (Mar 31, 2028). +7/30
- No unexercised option years on record, so new work likely has to be awarded when it ends. +20/20
- $7.2M obligated so far. +13/20
- Last time it was competed among eligible firms (set-aside competition) with 6 offers (crowded field). +12/20
- Standalone contract, so the follow-on is not tied to an existing vehicle. +10/10
- The incumbent has held it since 2024 (about 2 years).
| Department of Transportation Federal Highway Administration | Highway, Street, and Bridge… | PR | $7,212,477 | Mar 31, 2028 |
| 60 | BELLINGHAM MARINE INDUSTRIES INC GLCA 210865 REPLACE WAHWEEP DOCK DB Why 60? ends in 12 mo · options could run to Mar 2028 · $11M · 2 offers last time · standalone contract- Ends in about 12 months (Oct 29, 2027). +18/30
- Unexercised options on record could extend it to Mar 1, 2028, so the agency may extend instead of recompeting. +0/20
- $11M obligated so far. +15/20
- Last time it was competed among eligible firms (set-aside competition) with 2 offers. +17/20
- Standalone contract, so the follow-on is not tied to an existing vehicle. +10/10
| Department of the Interior National Park Service | Highway, Street, and Bridge… | AZ | $10,937,525 | Oct 29, 2027 |